top of page
THE MARMARA ANTALYA
The reinforced concrete construction of the Antalya branch of The Marmara Hotels Chain started in January 2003 and was completed in December 2003. The hotel has an 8-story structure that rotates on water.
In the 5-star The Marmara Antalya Project, our team was involved with 140,000 m² of construction. In this project, our team used PERI Multiflex, Vario, Domino, Trio formworks, as well as PERI PD8 scaffolding systems.

The-Marmara-Antalya

The-Marmara-Antalya
1/1
bottom of page